More than 50 Years of construction Excellence
Since its inception, this Unit has been one of the core units of Galfar. The Unit’s commitment to quality & safety, professionalism, and integrity has helped it to grow from strength to strength. Having created benchmarks in the industry while delivering path-breaking projects, the division has an excellent track record of customer satisfaction.
PROJECTS
PROJECTS
Billion ( OMR )
Being Galfar’s first operating unit, over the years, the Civil & Environment Unit has built several landmark projects including palaces, commercial establishments, housing complexes, educational institutions, hospitals, monuments, religious structures, stadia, showrooms, telephone exchanges and residences. Being a Unit focused on safety and quality with ability to develop world class infrastructure, the Unit has taken up large civil works for industrial facilities such as iron ore palletization plant, reservoirs, fertilizer plant, amongst others. It has also constructed several hotels on turnkey basis across Oman.
Some of the medical facility projects undertaken by the unit in the earlier stages were the Ibri, Nizwa, and Sur General Hospitals. While the Ibri and Sur hospital projects were limited in scope, the Nizwa Hospital allowed the unit to complete Mechanical, Electrical, Plumbing & HVAC paved the way for several large projects viz. Salalah Extended Health Centre, National Heart Centre at Royal Hospital, Accident, Emergency & Burns unit, and Salalah Cardiac Centre followed by operation and maintenance services for these facilities.
Over the years, the unit has executed several coveted projects for the Royal Court Affairs and other Statutory Authorities including guest complexes, office complexes, border posts, correctional facilities, and other utility buildings.
The Unit also has its core strengths in the Environment sector having completed Oman’s first of its kind Membrane Bioreactor based Al Ansab STP, the region’s largest vacuum sewer network at Seeb, several STPs across Oman, sewage collection & conveyance networks, Reverse Osmosis plants and Operation & Maintenance services for such installations.
The Unit is involved in following sectors within overall Oman Complex Building such as Hotels, Hospitals and Airport Terminal Buildings Environmental Projects – STP and Sewage Networks O&M Projects – Sewage Networks, Building Facilities (Hospital / Educational facilities)
OUR ICONIC PROJECTS OUR ICONIC PROJECTS
Medical City for Military and Security Services:
Contract A consists of the construction and commissioning of a main hospital building and associated ancillary buildings along with all relevant external works. The hospital will accommodate 458 beds and approximately 172,785m2 of program space with three levels of basements.
Muscat waste water scheme Project Al Ansab STP:
Supply, Detailed Engineering, Construction, Installation and Testing / Commissioning of 52,500 m3/day Capacity Extended Aeration with MBR Technology Treatment Complex. (Plot Preparation, Process RCC Tanks & Structures, Non-Process Building, Process Equipment and Piping, Non-Process Services, Electrical Supply and External Roads / Paths and Paving.
Bank Muscat Headquarters:
Services works for the Main Office Building, Energy Center Building, and External Car Parking.
The total built-up area of the Main office Building is 36,000 Sqm with a Basement Floor + Ground Floor + 4 Upper Floors. The Footprint (Basement Floor) of the building is 5,000 Sqm (approx) mainly utilized for Services facilities.
Salalah International Airport:
Development of Salalah international Airport
Taxiway & Aprons including Airfield Lighting system, Landside Roads & Bridges, Airside Roads with Perimeter Security Fencing, Air Quality & Noise Monitoring System, Storm water drainage Network, Landscaping with Irrigation Network, Landside Traffic Management System.