Construction of Hasik – A’Shuwaymiyah Asphalt Road
Scope of Work:
The road is single lane carriageway with 7 m wide about 94 Km long; 60 Km of this road runs on top of mountainous terrain with the road rising nearly to 600 m above MSL involving all kinds of slope protection works viz. Shotcrete, Reinforced wire mesh, rockfall barrier, pile wall, etc
- Wadi bridge – 2 Nos
- Box Culverts – 207 Nos
- MSE Wall – 7,925 sqm
- Concrete safety barriers – 16,418 Lm